The Air District's permitting process encompasses multiple permit types to ensure comprehensive environmental compliance. While most projects require two fundamental permits, certain major facilities are subject to additional regulatory oversight.
The standard permitting process requires two critical permits that must be obtained prior to initiating any project. The two essential permits are the Authority to Construct (ATC) and the Permit to Operate (PO).
The Authority to Construct (ATC) is the initial permit that evaluates and approves the proposed project's design and environmental specifications. This permit ensure that the planned facility meets all applicable air quality regulations before construction begins. Applicants must demonstrate compliance with all regulations and provide detailed project plans for review.
Following successful construction, the Permit to Operate (PO) becomes the final regulatory requirement. This permit validates that the completed facility operates in full compliance with established standards and emissions regulations.
For major stationary sources with significant emissions, Title V permits represent comprehensive operating permits which consolidate all air quality requirements for large-scale facilitates. Title V permits may impose more stringent monitoring, recordkeeping, and reporting obligations.
Unlike standard ATC and PO permits, Title V permits apply to facilities that emit significant quantities of regulated pollutants.
By law, an air quality permit is required for several scenarios which include:
An Air District permit is a document that gives the permit holder authorization to build equipment and/or to operate that equipment. Nearly all stationary equipment that emits to the atmosphere requires an Air District permit. Each project is evaluated before a business can build and operate their equipment to ensure that all air quality requirements are met. During the permitting process, air quality engineers review projects, calculate emissions and determine compliance with all federal, state and local regulations before issuing a permit.
Have a specific inquiry? Please use the appropriate contact method:
Open Burn Inquiries:
Asbestos, Demolition, Renovation, or Job Number Questions:
Facility with Assigned Engineering Staff:
General Questions on Permitting or No Assigned Staff:
Questions on Compliance Assistance:
Asbestos
Asbesto
415 749-4762 asbestosjobs@baaqmd.gov
Información general de ingeniería
415.749.4990 permits@baaqmd.gov